Thursday, September 23, 2010

Bathroom Before and After

before vanity
after with new vanity and wall on right
before window
after window with sink and counter gone
before shower
after with wonderful new shower
after shower with shot of linen cabinet
pebble shower floor
sink faucet with home made concrete counter
fan/light combo with crown and wall color (above shower)
We put our new bathroom where our old kitchen used to be. So the before's are kitchen and the after's are bathroom, just to be clear. Just for fun I threw in a picture of the old bathroom (where the new kitchen will be) so you can see what we had and what we have now.

A little summary of what we (Eric) did: built a wall in the middle of the kitchen, ran electrical, hired a plumber to run plumbing, built a shower wall, prepped and poured a shower pan, hauled tile from Denver, tiled the floor, shower floor,  and shower walls. built a vanity, mirror, and a linen closet (Eric did this at work), made a concrete countertop, installed all plumbing fixtures, hired a texture guy, painted, installed a new window, installed lighting/fan/outlets, installed a door/trim/crown. I'm probably forgetting a few things but you get the idea. Have I mentioned I LOVE THE NEW BATHROOM!

Stay tuned for kitchen progress.