|
before vanity |
|
after with new vanity and wall on right |
|
before window |
|
after window with sink and counter gone |
|
before shower |
|
after with wonderful new shower |
|
after shower with shot of linen cabinet |
|
pebble shower floor |
|
sink faucet with home made concrete counter |
|
fan/light combo with crown and wall color (above shower) |
We put our new bathroom where our old kitchen used to be. So the before's are kitchen and the after's are bathroom, just to be clear. Just for fun I threw in a picture of the old bathroom (where the new kitchen will be) so you can see what we had and what we have now.
A little summary of what we (Eric) did: built a wall in the middle of the kitchen, ran electrical, hired a plumber to run plumbing, built a shower wall, prepped and poured a shower pan, hauled tile from Denver, tiled the floor, shower floor, and shower walls. built a vanity, mirror, and a linen closet (Eric did this at work), made a concrete countertop, installed all plumbing fixtures, hired a texture guy, painted, installed a new window, installed lighting/fan/outlets, installed a door/trim/crown. I'm probably forgetting a few things but you get the idea. Have I mentioned I LOVE THE NEW BATHROOM!
Stay tuned for kitchen progress.
No comments:
Post a Comment